Installing 55 gallon drum as boiler vesselIf you can afford and acquire a properly certified steam vessel, by all means install one. However, don't underestimate the economical versatility of the 55 gallon food grade barrel. In all the years I've been using them, I've not seen a single one fail catastrophically. They will start to warp at around 8 psi, and shortly after that the curled seams at top and bottom will begin to unfold, releasing the pressure slowly. If this happens, the drum is ruined, so be ready to replace it. The obvious solution though is to have proper over-pressure controls in place to ensure this doesn't happen.
Weld, silver solder or braze a 1" black iron nipple to the barrel about 1" to 1.5" above the bottom. Place the barrel on the square tubing and measure for location of a 3" chase through the boiler for this pipe to exit as shown. When you lay a few more layers of block, repeat the process for the top steam pipe, also 1" black iron, which will thread into the 2" NPT threaded opening on the top of the drum, using a 1" X 2" threaded bushing.
As you lay your blocks be sure to keep extending the rebar vertically, and every two rows place horizontal rebar around the whole boiler as shown. Weld or otherwise tie all the rebar together and fill all the voids with concrete. When you reach the top two rows of block, you'll need to install your chimney outlet. Don't run it straight out the top of the boiler or you'll have no way to clean the chimney pipe. Instead, purchase a double wall insulated stainless steel Tee with a cleanout opening and install on the rear of the boiler with the cleanout facing down as shown. This way you can run a chimney cleaning brush up through the pipe from the bottom. Cut a 1/4" or 3/8" steel plate to fit the top. 3/8" plate is better suited for this purpose, but if you expect to be able to lift it on and off by yourself, stick with 1/4" plate. Bolt concrete anchors to holes you'll cut in the plate, matching the voids in the concrete blocks below. Fill the voids in your top two rows of block with concrete and while still wet, place the lid on top so the anchors sink down into the wet concrete and then place several bags of cement or other heavy weight on top to keep the lid firmly in place while the concrete cures for 24 hours. Later, you'll remove the nuts from the concrete anchors and lift the top back off. To ensure a good seal which is extremely critical, place about 1" of fresh mortar mix on the top row of filled blocks, apply wax paper over the wet mortar mix, and then set the lid back in place and bolt it down. This will force the mortar mix to form a perfect seal between your boiler and lid.
Continue to Boiler Electrical and Water Feed System _________________________________________
RR Video - 415 N Empire Creek Road - Malo, WA 99150 - USA _____________________________________________________________ Text, Images, and Videos on this website are copyrighted. These video clips may be freely distributed and posted elsewhere for non-commercial purposes, provided they're left in the original form and linked back to www.mushroomvideos.com |